Public GPS Traces from Jarrardi
|
|
by Jarrardi in construction, path tracing, walking The path of the Middleton Road straightening project (under construction, but still roadmix gravel right now) |
|
|
|
by Jarrardi in walking, path tracing The sidewalks of River Walk Crossing subdivision, phase III |
|
|
|
by Jarrardi in construction, walking The bridge portion of the Middleton Road Straightening Project crossing Lawrence Kennedy Canal. |
|
|
|
by Jarrardi in construction, walking, path tracing The portion of the Kennedy Canal path in River Walk Ranch subdivision phase 3, only partially paved at this point |
|
|
|
by Jarrardi in construction, walking, path tracing River Walk Ranch subdivision, phase 3 sidewalks, now fully paved (although the accompanying roads are still dirt) |
|
|
|
by Jarrardi in construction, walking, road tracing River Walk Ranch subdivision, phase 3 roads. They've been dug, but not filled, much less paved. |
|
|
|
by Jarrardi in walking, foot path, construction Maverik construction and changes to Hartley and Bozic intersection pedestrian flows |
|
|
|
by Jarrardi in walking, foot path Walking path/sidewalk along Idahome |
|
|
|
by Jarrardi in walking, construction Idahome RV Park roads, buildings, and shared areas |
|
|
|
by Jarrardi in walking, construction Ceemtary intersection changes to crosswalk |
|
|
|
by Jarrardi in walking, foot path Walking Path along Bozic business subdivision plus changes to Hartley crosswalk |
|
|
|
by Jarrardi in constrution, car New road and bridge at the College of Western Idaho Nampa campus |
|
|
|
by Jarrardi in walking, foot path Mill at Middleton walking path (and fence line) |
|
|
|
by Jarrardi in streetcomplete More fencline. Will address when I get home. via StreetComplete 59.3 |
|
|
|
by Jarrardi in streetcomplete I'm not sure if I'm doing this right. I'll correct when I get home. This is the line of the fence, chest high, black metal. I will address this note when I get home. via StreetComplete 59.3 |
|
|
|
The River Pointe I portion of the walking path north of Lawrence Kennedy Canal |
|
|
|
by Jarrardi in construction, subdivision, Middleton Idaho Access path under construction from Hidden Mill subdivision to walking path |
|
|
|
by Jarrardi in construction, subdivision, Middleton Idaho Fence just completed along perimeter of Hidden Mill subdivision, including access pathways (under construction) to walking path |
|
|
|
by Jarrardi in construction, walking Walked all the roads under construction in River Walk Crossing subdivision Phase II (except Sawtooth Avenue, which is a different trace) |
|
|
|
by Jarrardi in construction, walking Walked the portion of Sawtooth Lake Drive still under construction (River Walk Crossing subdivision Phase II) |