shinjiman's Notes
Notes submitted or commented on by shinjiman
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 4693833 | shinjiman | A roundabout to be built here. https://www.mainroads.wa.gov.au/projects-initiatives/all-projects/metropolitan/scarborough-beach-road-and-green-street/
|
|||
| 4769146 | Majew Lime | Speed limit on most, if not all, roads on campus are 30 km/h, not 40 |
|||
| 4756375 | Majew Lime | New speed limit of 50 for the whole road |
|||
| 4178368 | The second half of the station is planned to opened following another shutdown of the Airport and Midland lines, this time between 28 March and 8 April 2024. The eastbound track will be realigned to platform four of Bayswater station. Platforms two and three will open when the Morley–Ellenbrook line opens, which is planned for the end of 2024. CE |
||||
| 4820797 | shinjiman | A roundabout had been built on this location. https://www.mainroads.wa.gov.au/4a1b98/globalassets/technical-commercial/road-safety/black-spot-program/2021-22-state-black-spot-program-regional-and-metropolitan-local-roads.pdf
|
|||
| 4639453 | shinjiman | A roundabout to be built here. |
|||
| 4541180 | sahshoor | Railway segment tagged as under construction |
|||
| 4546706 | bouzinac | where is the ellenbrook train relationship? |
|||
| 2370174 | BLEM1029 | Proposed interchange. |
|||
| 4072680 | shinjiman | Drumpellier Drive north (between Park Street and The Promenade) opens 16/01/2024. |