OpenStreetMap logo OpenStreetMap

shinjiman's Notes

Notes submitted or commented on by shinjiman

Id Creator Description Created at Last changed
4693833 shinjiman

A roundabout to be built here.

https://www.mainroads.wa.gov.au/projects-initiatives/all-projects/metropolitan/scarborough-beach-road-and-green-street/
https://imagine.vincent.wa.gov.au/scarborough-intersection
https://www.stirling.wa.gov.au/city-and-council/shaping-our-city/search-all-projects/scarborough-beach-road-and-green-street-roundabout

4769146 Majew Lime

Speed limit on most, if not all, roads on campus are 30 km/h, not 40

4756375 Majew Lime

New speed limit of 50 for the whole road

4178368

The second half of the station is planned to opened following another shutdown of the Airport and Midland lines, this time between 28 March and 8 April 2024. The eastbound track will be realigned to platform four of Bayswater station. Platforms two and three will open when the Morley–Ellenbrook line opens, which is planned for the end of 2024. CE

4820797 shinjiman

A roundabout had been built on this location.

https://www.mainroads.wa.gov.au/4a1b98/globalassets/technical-commercial/road-safety/black-spot-program/2021-22-state-black-spot-program-regional-and-metropolitan-local-roads.pdf
https://www.mainroads.wa.gov.au/4a1bba/globalassets/technical-commercial/road-safety/black-spot-program/2022-23-state-black-spot-program-regional-and-metropolitan-local-roads.pdf

4639453 shinjiman

A roundabout to be built here.

https://www.mainroads.wa.gov.au/projects-initiatives/all-projects/metropolitan/morley-drive-bath-road-intersection-upgrade/

4541180 sahshoor

Railway segment tagged as under construction

4546706 bouzinac

where is the ellenbrook train relationship?

2370174 BLEM1029

Proposed interchange.

4072680 shinjiman

Drumpellier Drive north (between Park Street and The Promenade) opens 16/01/2024.