kevjs1982's Notes
Notes submitted or commented on by kevjs1982
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 4297176 | kevjs1982 | New protected cycle route under construction - works due to complete September 2024. The two north bound bus stops will be consolidated into two. |
|||
| 1064443 | SK53 | Not sure this is actually Beechdale Court as that seems to be name of NCH building. |
|||
| 3246785 | JayTurnr | In 2014 the "Territorial and Army Volunteer Reserve (TAVR)" force was renamed the "Army Reserve". Former "TA Centres" should now have been renamed as "Army Reserve Centres". Has the rebranding been completed? |
|||
| 4388760 | kevjs1982 | Roundabout under reconstruction. Cycleway visible on south side, not sure of exact nature of pedestrian crossings - potentially Zebra / Paraell. |
|||
| 4388755 | kevjs1982 | Junction layout being reconstructed. Need to survey the exact route of the pedestrian and cycle crossings once complete. |
|||
| 2446796 | SK53 | Imagine bus stop name has changed by now |
|||
| 4478865 | kevjs1982 | Ratcliffe Power Station has ceased operation September 2024 - decommissioning expected to take approx. 2 years before demolition commences & site redeveloped. |
|||
| 1615424 | sophietheopossum | platform 6b |
|||
| 4368004 | kevjs1982 | NCT bus changes from 1 Sept Service 5 - Will follow existing route north of here, then the existing 6 to Edwalton. Service 6 - Will Follow existing route north of here, then the existing 7 to Gamston (Morrisons) Service 7 - Will Follow the existing 5 route to ~ Firs Road stop, then then continue to Edwalton Fields onto a temporary loop ~ Lilly Grove Appears that Melton Gardens will be unserved. Need to resurvey once stops have changed to confirm. Need to check if the N6 still exists. |
|||
| 4474664 | kevjs1982 | The Goose is now Hickory's |