eerib's Notes
Notes submitted or commented on by eerib
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 5071990 | eerib | New pump track located somewhere around here. I believe this replaces the Yorkson Mountain Bike Park. Requires a survey to confirm. |
|||
| 5058804 | eerib | Parry-Evans Trail here looks to be mostly complete with paved asphalt. Need to survey to verify. |
|||
| 5051944 | eerib | New large detention pond ("Smith Detention Pond") built around here. |
|||
| 4948383 | eerib | This road has on-street protected bike lanes (concrete barrier between travel lanes and bicycle lanes) to survey. I have already mapped the sidewalk MUP's but not the protected bike lanes. |
|||
| 5018929 | eerib | MILA restaurant closing on November 14th 2025. Replace with a vacant shop on November 15th 2025. |
|||
| 5009277 | eerib | Darby's last day is Saturday, Nov. 1 https://vancouversun.com/news/local-news/last-call-coming-for-kitsilanos-darbys-pub |
|||
| 5020212 | eerib | Baroness Broadway location closing October 31, 2025. Replace with a vacate shop after that date. |
|||
| 4776983 | eerib | Area here is supposed to become "Glenn Valley Marina Park". Check to see what, if any, construction is occurring here and what the status of the area currently is. |
|||
| 5010945 | eerib | Metro Vancouver posted a video about the repaired boardwalk. https://www.youtube.com/watch?v=f9Elj_ZJj8M Need to survey and if reopened then update access tags for the boardwalk section and remove the small fence ways. |
|||
| 5019023 | eerib | "The Park Theatre" here closing on October 26, 2025. https://dailyhive.com/vancouver/vancouver-park-theatre-closing-80-years |