OpenStreetMap logo OpenStreetMap

andrepoiy's Notes

Notes submitted or commented on by andrepoiy

Id Creator Description Created at Last changed
2299830 andrepoiy

Major Mackenzie Drive widening

3111223 Mateusz Konieczny

highway=secondary to nowhere is really suspicious here

it completely mismatches how highway=secondary is defined in OSM

2857667 CruiseFrog

Photo Radar camera in use

2269195 andrepoiy

City of Vaughan is constructing new bike paths here.

https://www.vaughan.ca/projects/projects_and_studies/cycling/clark_avenue_bike_paths/Pages/default.aspx

2147988 andrepoiy

New rapidway from Davis Dr to Savage on Yonge

2894253

Don Roadway from Lakeshore to Villiers is still open

2372798 andrepoiy

Intersection reconstruction: adds new turn lanes. Anticipated completion is December 2020

source:
https://www.vaughan.ca/news/Info%20Centre/General%20Documents/Intersection%20Improvements%20-%20Major%20Mackenzie%20Dr%20at%20Vaughan%20City%20Hall%20-%20Sept%20to%20Dec%202020.pdf

2860843 OrdinaryScarlett

If possible, please redraw the Highway 427 extension to better reflect the actual road geometry. Thank you!

156991

Yonge VIVA rapidway construction will begin soon - Highway 7 to 19th Avenue

905917 andrewpmk

divided road