OpenStreetMap logo OpenStreetMap

Shrinks99's Notes

Notes submitted or commented on by Shrinks99

Id Creator Description Created at Last changed
4794912 Shrinks99

Entire buildings made up of multi-polygons

3072851 andrewpmk

Glen Rd bridge/tunnel closed March 7, 2022 until late 2022 due to construction

4083936 PcMouse1

survey if the footpath connects

4752652 Shrinks99

Water feature currently being restored due to erosion from flooding

4585538 andrewpmk

Traffic signal

4730937 Shrinks99

Area is a construction zone for Ontario Line bridge work.

4196892 skfd

need to redo when satellite images available

4055060 Shrinks99

Area has been clearcut

4677472 Shrinks99

Warden Station bus bays are all being demolished. Construction currently underway.

https://www.ttc.ca/riding-the-ttc/Updates/Warden-Station-bus-terminal-closure

https://www.cbc.ca/news/canada/toronto/ttc-warden-station-bus-terminal-accessibility-revitalization-1.7400205

3997154 Shrinks99

New roads and pedestrian spaces are FINALLY open around Eglinton West station however the map (and satelite imagery) are not yet reflective of this change.