completion of bikeway and road geometry update
reassigned route network to MUP trail
splitting and tracing for new rotary trail extension
shared lane denoted by sharrows as far north as Bater Street
sharrows denote shared lane on 14th avenue
There is no marked cycle crossing or protected bike lanes at this intersection.
Removed redundant cycleway mapping. Is already mapped as part of Sinclair Road.
construction of new MUP on Beacon West
75 no longer runs directionally by royal oak, runs up Elk Lake both directions.
temporary long-term detour during firehall construction
new segment of perimeter trail corrected name and classification
bidirectional MUP for a stub connecting to the crosswalk at Cedar