CycleStreets's Notes
Notes submitted or commented on by CycleStreets
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 2941318 | CycleStreets | Is this tiny stretch really a bridleway? |
|||
| 2686502 | CycleStreets | Are cycles allowed through here (i.e. is there no 'no cycling' sign here)? |
|||
| 2686485 | CycleStreets | Is cycling permitted on this cut-through (i.e. is there no 'no cycling' sign)? |
|||
| 2964423 | CycleStreets | Is this still under construction? There is a construction tag shown. |
|||
| 3533410 | CycleStreets | Is this section two-way? The aerial imagery possibly suggests otherwise. |
|||
| 2540205 | CycleStreets | Possible connection here? Needs ground survey. |
|||
| 3502126 | CycleStreets | Possibly the bridge should level -1 as its main feature is that it is technically below the water... |
|||
| 2797746 | CycleStreets | Is this passable? We've been told: "Wall between public footway and private land." |
|||
| 2540207 | CycleStreets | Possible missing parking and route here? Needs ground survey. |
|||
| 3492314 | CycleStreets | Could someone verify this underpass route is closed? We have received feedback: 'The pedestrian / cycle path marked coleshill interchange, starting at ryeclose croft, which used to go under the M6, is closed. Looks like since a long time. It connects Chelmsley Wood and Coleshill.' |