Marking the new bike lanes on US Hwy 45
Marking paths in Elver as paved with asphalt.
Setting the material type tags for some paths
There are no traffic lights at this intersection.
The bike trail doesn't have a stop sign at this crossing. The street has the stop sign.
Adding the bike boulevard designation to Lafollette Ave
Realigning the Garver path to match the satellite imagery.
Adding some fix me notes to the end of the Great Sauk Trail.
Adding to the foot paths in Olbrich Garden
Fixing alignment of the bike path and park foot path with recent construction
Added missing footpath junction.
Added more of the Cannonball path off-road bike trails
Expanded the outline of the Biergarten to surround the seating area.
Sidewalk is now a cycle path after recent construction.
Add the Cannonball path off-road bike trails.
Fixing part of the alignment for the lake loop with the ongoing construction.